![Gemma Power Plant](https://sossamonconstruction.com/wp-content/uploads/2021/02/Gemma-Power-Plant-Hero-image.jpg)
Kings Mountain Energy Center
Kings Mountain, NC
The Kings Mountain Energy Center is a 475 MW state-of-the-art natural gas-fired power plant facility in Cleveland County, North Carolina. Sossamon Construction’s scope of work included construction of foundations and slabs, erection of 4 Pre-engineered metal buildings (totaling approximately 24,000 SF), framing and drywall, painting, acoustical ceiling work, floor finishes, overhead doors, doors and hardware, plumbing and electrical for the following:
- Administration Building
- Circ Water Chemical Feed Bldg
- Control Electric Building
- Water Treatment Building
Owner
Kings Mountain Energy Center
Size
24,000 SF
Community
Industrial
More Projects
See All Case Studies
![Featured image for “Veterans Affairs Nursing Home”](https://sossamonconstruction.com/wp-content/uploads/2021/02/VA-drone-1.jpg)
Veterans Affairs Nursing Home
Palmetto Patriots Home is a veterans nursing home facility under construction on Hampshire Drive. The 145,000-square foot facility will include…
![Featured image for “Randolph Trucking”](https://sossamonconstruction.com/wp-content/uploads/2021/03/Randolph-Trucking-Sidebar-image-3.jpg)
Randolph Trucking
Both facilities included office administration area, mezzanine storage, eight overhead doors for truck maintenance, truck pit for undercarriage maintenance and…
![Featured image for “Comporium Fields”](https://sossamonconstruction.com/wp-content/uploads/2017/04/Riverview-Athletic-Complex-Sidebar-image-1-3.jpg)
Comporium Fields
Riverview Athletic Complex consists of four synthetic turf multipurpose fields. Fort Mill, SC…