Chassis Shipping and Loading Facility
Gaffney, SC
CM @ Risk
The Chassis Shipping and Loading facility is a newly constructed project with 13,500 square feet of a truck loading area, office space and mezzanine storage. This building has two 20 ton bridge cranes. The 11 acre site consists of concrete paving, retaining walls, site lighting, site security, heavy duty asphalt paving for chassis and trailers. The project was completed in August of 2017 with a 7 months duration, even though substantial unsuitable soils were encountered.
Owner
Daimler Trucks North America
Size
13,500 SF
Start / Completion Date
January 2017 / July 2017
Delivery
CM at Risk
Community
Industrial
More Projects
See All Case Studies